Get a complete breakdown of what an AI factory is, how 800V DC power works, why Louisiana has the best incentives, and how tokens are the new commodity. No jargon. Plain English.
Any Louisiana college, university, or K-12 school can participate. Register your institution, find out what grants you qualify for, and get connected to AI compute resources.
At GTC 2026, NVIDIA announced the 50-State Plan — replicating the UF model in every state. Chris Malachowsky (NVIDIA co-founder, UF alumnus) championed Florida's $180M investment. Louisiana has no champion, no plan, and no infrastructure. Meta is spending $27 billion in rural Louisiana. Amazon is spending $12 billion. Hut 8 is spending $10 billion. None of them serve a single university student or K-12 classroom. $37 billion in AI compute being built in this state and zero of it accessible to the people who live here.
We build the infrastructure. Universities get compute access. K-12 schools get workforce pipeline. The state gets ahead. No donation required. The energy-first business model — cheapest power in the country at Henry Hub pricing — funds itself. Two anchor sites already identified. Vendors ready. Incentives allocated. All that's missing is the paperwork. That's what this page is for.
40 miles from Henry Hub — the national benchmark for natural gas. $0.04–0.058/kWh behind the meter. Virginia pays $0.12. California pays $0.27. We don't need the grid. We generate our own power.
First Solar's $1.1 billion factory in New Iberia. American-made Series 7 TR1 panels. 30 miles from Lafayette, 90 miles from Willow Glen. Louisiana supply chain. Louisiana jobs.
96% power delivery efficiency vs 83% traditional. 45% less copper. Built to NVIDIA's DSX reference design. The same architecture powering the world's largest AI factories.
45–55% historic tax credits. 80% property tax abatement. 20-year sales tax exemption. 30% solar ITC. FREE workforce training. Federal + state + local — all on the same project.
100% bonus depreciation permanent. Opportunity Zones. CHIPS Act. $1.355B broadband funding. LED FastStart #1 for 13 years. The Big Beautiful Bill put America first. Louisiana is leading.
Louisiana Cat (generators). First Solar (panels). Eaton (800V DC). ATMOS Energy (gas). Diamond Green Diesel (renewable fuel). All American-made. All within driving distance.
No black box. No waiting in the dark. You see exactly where your application is at every step. Here's the process from start to finish.
Federal and state funding for AI infrastructure is allocated and waiting to be claimed. Multiple programs have expiration dates. Nobody is filing the paperwork. That's what this initiative fixes.
How This Works — 4 Steps
(337) 448-4242 | info@louisianaai.net | louisianaai.net
Lafayette, Louisiana